Summary for Test 2020-09-16-18-1
Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
| Project Identifiers | Project ID: 214571 DEA: 020J1104 EFIS: 0219000062 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-33.1/42.1 |
| Award Date | 02/07/2020 |
| Closeout Date | 04/27/2021 |
| Work Description | PLACE HMA & SHOULDER BACKING, & REMOVE & REPLACE PAVEMENT DELINEATION. |
| Location Description | PLUMAS COUNTY AT AND NEAR KEDDIE FROM INDIAN CREEK BRIDGE TO 0.3 MILE WEST OF SPANISH CREEK BRIDGE NO. 09-0018 |
| QA Service Level | 1 (Verified on 01/22/2020) |
Sample Information
| Sample Taken Date | 09/16/2020 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/28/2020 |
| Sample type | Department Acceptance | A brief description of the sample | Modified Asphalt Binder PG 64-28M |
| The quantity of what the sample constitutes | 1 Can, #10 test, #9(896936), #11(896938), #12(896939), #13(896940) NO TEST | From where was the sample collected | Source |
| First name of sampler or witnessed by | Derick | Last name of sampler or witnessed by | PEI |
| Title of sampler | PEI | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | western | Transportation Laboratory (TL) Number | 896937 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-09-16-18
DIME Test ID: 2020-09-16-18-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-10-09
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 10/05/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 175.700 grams
Mass of container #1 before test (m1i): 210.440 grams
Mass of container #1 after test (m1f): 210.190 grams
Average mass change: -0.720 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/9/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
