Summary for Test 2020-08-22-5-1
Test performed: AASHTO T301-13Project Information
| Project Identifiers | Project ID: 214882 DEA: 022H9904 EFIS: 0217000045 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-44-51.6/52.2 |
| Award Date | 05/27/2020 |
| Closeout Date | 09/23/2020 |
| Work Description | ROADWAY EXCAVATION, AGGREGATE BASE & HOT MIX ASPHALT. |
| Location Description | SHASTA COUNTY NEAR VIOLA FROM 0.4 MILE EAST TO 1.1 MILES EAST OF BRIDGE CREEK ROAD |
| QA Service Level | 1 (Verified on 05/26/2020) |
Sample Information
| Sample Taken Date | 08/22/2020 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/28/2020 | Sample type | Department Acceptance |
| A brief description of the sample | AB PG 58-34M | The quantity of what the sample constitutes | 1 Can #1 TEST, #2(851365) No Test |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | D |
| Last name of sampler or witnessed by | Harper | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | JF Shea Fawndale | |
| Transportation Laboratory (TL) Number | 851364 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-08-22-5
DIME Test ID: 2020-08-22-5-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2020-09-28
Test Results
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 09/23/2020
Final Reading from the testing machine (X): 3 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/28/2020 ✔
