Summary for Test 2020-06-24-36-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
| Award Date | 05/01/2019 |
| Closeout Date | 02/22/2024 |
| Work Description | Not set |
| Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
| QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
| Sample Taken Date | 06/24/2020 | Sample Unique Key | 36 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/16/2020 |
| Sample type | Department Acceptance | A brief description of the sample | TEST Asphalt Binder |
| The quantity of what the sample constitutes | 4 cans each, #10 TEST (#7 765681, #8 723333, #9 060127) | From where was the sample collected | Source |
| First name of sampler or witnessed by | Luke | Last name of sampler or witnessed by | Baptista |
| Title of sampler | Inspector | Telephone number of sampler | 530-812-7116 |
| Laboratory sample identification | Linked DIME Sample ID | AB206051 | |
| The fabricator/manufacturer/facility name | Pacific Northwest Oil - Stockton, CA | Transportation Laboratory (TL) Number | 060128 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-24-36
DIME Test ID: 2020-06-24-36-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-23
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 07/31/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 169.501 grams
Mass of container #1 before test (m1i): 204.320 grams
Mass of container #1 after test (m1f): 204.314 grams
Average mass change: -0.017 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2020 ✔
