Summary for Test 2020-09-17-3-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
| Award Date | 05/01/2019 |
| Closeout Date | 02/22/2024 |
| Work Description | Not set |
| Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
| QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
| Sample Taken Date | 09/17/2020 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/17/2020 |
| Sample type | Quality Assurance | A brief description of the sample | Barsplice Zap Screwlok Coupler |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | V | Last name of sampler or witnessed by | Vong |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Barsplice, Nucor | Transportation Laboratory (TL) Number | C836606 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Barsplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #6 | Coupler Model | Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 73115928 | Rebar Heat Number(s) | 3500012020 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-09-17-3
DIME Test ID: 2020-09-17-3-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-09-22
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 09/17/2020
UTM: 400kip
Temperature: 72.00 f
Halo ID: Small
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | No. 6/19mm | 2 | -0.0016 | 0.44 | 42859 | 97407 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 9/22/2020 ✔
