Summary for Test 2020-09-02-19-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 214426 DEA: 030A5704 EFIS: 0300020593 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-20-13.3/R18.2 |
| Award Date | 01/02/2020 |
| Closeout Date | 07/15/2025 |
| Work Description | Browns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK. |
| Location Description | YUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE |
| QA Service Level | 1 (Verified on 10/23/2019) |
Sample Information
| Sample Taken Date | 09/02/2020 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/17/2020 | Sample type | Quality Assurance |
| A brief description of the sample | Coupler | The quantity of what the sample constitutes | 84 |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Jason |
| Last name of sampler or witnessed by | Gramlick | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Pacific Steel | |
| Transportation Laboratory (TL) Number | C710860 | Inspector Lot Number from the Transportation Laboratory (TL) Form | B3-336-20 |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Cascade |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #5 | Coupler Model | DBL BRL Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 0147 | Rebar Heat Number(s) | 133820 133420 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-09-02-19
DIME Test ID: 2020-09-02-19-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-09-17
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 09/17/2020
UTM: 400kip
Temperature: 72 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 1 | 5/16mm | 0.31 | 30903.77 | 99690 | service splice | spaine |
General comments (publicly viewable) (Max 1000 characters): service splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 9/17/2020 ✔
