Summary for Test 2020-09-08-5-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Sample Information
Sample Taken Date | 09/08/2020 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/09/2020 |
Sample type | Quality Assurance | A brief description of the sample | Flash Welded Rebar Hoops |
The quantity of what the sample constitutes | 569 hoops | From where was the sample collected | Source |
First name of sampler or witnessed by | Clifford | Last name of sampler or witnessed by | William |
Title of sampler | QA Inspector | Telephone number of sampler | 17142674733 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Etiwanda | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L78-089-20 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4099826 |
Hoop Manufacturer Lot Number(s) | 1, 2, 3, and 4 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | #7 |
Diameter of Hoop | 4'-6" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | CMC Rebar |
Welding Company | CMC Rebar (Etiwanda) | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2020-09-08-5
DIME Test ID: 2020-09-08-5-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-09-10
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 09/10/2020
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | 7/22mm | 0.6 | 57761.64 | 96269 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 9/10/2020 ✔