Summary for Test 2020-08-18-29-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 210673 DEA: 042640F4 EFIS: 0400020132 COOP: 042308A3 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-- |
| Award Date | 08/08/2019 |
| Closeout Date | 02/16/2024 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/11/2022) |
Sample Information
| Sample Taken Date | 08/18/2020 | Sample Unique Key | 29 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/18/2020 | Sample type | Verification |
| A brief description of the sample | 1/2" HMA w/RAP | The quantity of what the sample constitutes | 2 bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | CT Anthony |
| Last name of sampler or witnessed by | Valdez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Bodean Mark West Quarry | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Mark West Quarry RAP Stockpile |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-18-29
DIME Test ID: 2020-08-18-29-2
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-09-02
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Reza Dineli
Date of test: 08/26/2020
Test procedure used?: Method A
Mass of the specimen basket assembly: no data
Mass of the specimen and specimen basket assembly prior to ignition: no data
Mass of HMA Sample prior to ignition: 1587.4 g
Mass Loss: no data
Mass of aggregate remaining after ignition: 1480.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 899.6 F
Corrected Asphalt Binder Content: 6.75 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/2/2020 ✔