Summary for Test 2014-11-13-3-1

Test performed: CTM 213-December 2012

Project Information

Project IdentifiersProject ID: 7463
DEA: 042640U4
EFIS: 0412000195
DIST-CO-RTE-PM04-SON-101-0.9/3.6
Award Date11/02/2012
Closeout Date06/03/2020
Work DescriptionCONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR
Location DescriptionSONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 09/11/2012)

Sample Information

Sample Taken Date11/13/2014 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing01/23/2015 Sample typeAnnual Source Testing
A brief description of the sampleConcrete Blend Sand The quantity of what the sample constitutes1
From where was the sample collectedSource First name of sampler or witnessed byQC
Last name of sampler or witnessed byQC Title of samplerQC
Telephone number of samplerUnknown Laboratory sample identification15FPCC-0049
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameSyar Lake Herman
Transportation Laboratory (TL) NumberC917849 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Syar Lake Herman
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile Quarry
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2014-11-13-3
DIME Test ID: 2014-11-13-3-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 213-December 2012: Method of Test for Organic Impurities in Concrete Sand
Test Release Date: 2015-01-29

Test Results


Input Type: Calculated
Tester's full name: Ed Perez
Date of test: 01/28/2015
Is the sample satisfactory or not?: Yes
Does debris exist: No
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/29/2015 ✔