Summary for Test 2020-07-23-34-5
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 214805 DEA: 044Q1604 EFIS: 0419000353 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-4-R32.7/R34.0 |
| Award Date | 05/04/2020 |
| Closeout Date | 09/25/2020 |
| Work Description | COLD PLANE AC PAVEMENT AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT. |
| Location Description | CONTRA COSTA COUNTY IN ANTIOCH AND BRENTWOOD FROM 0.2 MILE WEST OF LONE TREE WAY UNDERCROSSING TO SAND CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/19/2020) |
Sample Information
| Sample Taken Date | 07/23/2020 | Sample Unique Key | 34 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Verification |
| A brief description of the sample | 3/4 RHMA-G | The quantity of what the sample constitutes | 25 Boxes-Hot Mix Asphalt |
| From where was the sample collected | Source | First name of sampler or witnessed by | CTInspectorIArechiga |
| Last name of sampler or witnessed by | CTInspectorIArechiga | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Materials Vernalis | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | Not set | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2020-07-23-34
DIME Test ID: 2020-07-23-34-5
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-08-05
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Randy Cortez
Date of test: 07/30/2020
Test procedure used?: Method A
Mass of the specimen basket assembly: no data
Mass of the specimen and specimen basket assembly prior to ignition: no data
Mass of HMA Sample prior to ignition: 2051.1 g
Mass Loss: no data
Mass of aggregate remaining after ignition: 1891.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.48 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 899.6 F
Corrected Asphalt Binder Content: 7.28 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/5/2020 ✔
