Summary for Test 2020-07-19-3-3

Test performed: ASTM D36-14ε1

Project Information

Project IdentifiersProject ID: 214388
DEA: 051F6804
EFIS: 0514000046
DIST-CO-RTE-PM05-MON-1-39.8/74.6
Award Date11/05/2019
Closeout Date08/17/2022
Work DescriptionRHMA OVERLAY ON EXISTING ROADWAY AND REPLACE GUARDRAIL.
Location DescriptionMONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL
QA Service Level1 (Verified on 09/06/2019)

Sample Information

Sample Taken Date07/19/2020 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing07/28/2020 Sample typeDepartment Acceptance
A brief description of the sampleAsphalt Rubber Binder PG 64-16 The quantity of what the sample constitutes1 can, #1 TEST
From where was the sample collectedSource First name of sampler or witnessed byI
Last name of sampler or witnessed byVasques Title of samplerQC RTS
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSan Joaquin Refinery
Transportation Laboratory (TL) Number979361 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number1
Sublot number15 Asphalt Rubber Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-07-19-3
DIME Test ID: 2020-07-19-3-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Test Release Date: 2020-07-31

Test Results


ASTM Thermometer used?: C
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 07/31/2020
Softening Point Sample 1: 69 C
Softening Point Sample 2: no data
Bath Liquid: freshly boiled distilled water
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/31/2020 ✔