Summary for Test 2018-09-13-14-3

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 212779
DEA: 021H5804
EFIS: 0216000024
DIST-CO-RTE-PM02-PLU-70-58.4/R78.4
Award DateNot set
Closeout Date10/03/2025
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 01/08/2019)

Sample Information

Sample Taken Date09/13/2018 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing09/14/2018 Sample typeInformational
A brief description of the sampleSand, Silt, Rock, Clay The quantity of what the sample constitutesnot provided
From where was the sample collectedJob Site First name of sampler or witnessed byDan
Last name of sampler or witnessed byCurran Title of sampler
Telephone number of sampler Laboratory sample identificationD77643
Linked DIME Sample ID The fabricator/manufacturer/facility nameNot applicable
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedPlu 70 PM 72.0
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2018-09-13-14
DIME Test ID: 2018-09-13-14-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2020-08-18

Test Results


How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Terry McCormic
Date of test: 09/26/2018
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 95 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 89 %
As Received Gradation, Percent Passing 1 in. sieve: 85 %
As Received Gradation, Percent Passing 3/4 in. sieve: 82 %
As Received Gradation, Percent Passing 1/2 in. sieve: 77 %
As Received Gradation, Percent Passing 3/8 in. sieve: 75 %
As Received Gradation, Percent Passing #4 sieve: 68 %
As Received Gradation, Percent Passing #8 sieve: 62 %
As Received Gradation, Percent Passing #16 sieve: 54 %
As Received Gradation, Percent Passing #30 sieve: 43 %
As Received Gradation, Percent Passing #50 sieve: 33 %
As Received Gradation, Percent Passing #100 sieve: 25 %
As Received Gradation, Percent Passing #200 sieve: 16 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 94 %
As Used Gradation, Percent Passing 3/8 in. sieve: 91 %
As Used Gradation, Percent Passing #4 sieve: 83 %
As Used Gradation, Percent Passing #8 sieve: 76 %
As Used Gradation, Percent Passing #16 sieve: 66 %
As Used Gradation, Percent Passing #30 sieve: 52 %
As Used Gradation, Percent Passing #50 sieve: 40 %
As Used Gradation, Percent Passing #100 sieve: 30 %
As Used Gradation, Percent Passing #200 sieve: 20 %
R value: 64
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/18/2020 ✔