Summary for Test 2020-04-21-14-8
Test performed: ASTM C188-15Project Information
| Project Identifiers | Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 04/21/2020 | Sample Unique Key | 14 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/21/2020 | Sample type | Authorization |
| A brief description of the sample | Blended cement | The quantity of what the sample constitutes | 1 Bucket |
| From where was the sample collected | Source | First name of sampler or witnessed by | Plant |
| Last name of sampler or witnessed by | Personnel | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | CM205072 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | LaFarge Holcim | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Cementitious | Brand | LaFarge Holcim |
|---|---|---|---|
| Mill | Devils Slide | Type of Cementitious Material | Blended Cement |
Test Details
DIME Sample ID: 2020-04-21-14
DIME Test ID: 2020-04-21-14-8
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C188-15: Standard Test Method for Density of Hydraulic Cement
Test Release Date: 2020-07-24
Test Results
Input Type: Measured
Tester's full name: Benjamin Lenz
Date of test: 06/24/2020
Density of hydraulic cement: 2.981 g/cm^3
Specific gravity of cement: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/24/2020 ✔
