Summary for Test 2013-06-29-6180-2
Test performed: CTM 556-June 2010Project Information
| Project Identifiers | Project ID: 8127 DEA: 080N5904 EFIS: 0800000533 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R85.2 |
| Award Date | 02/07/2013 |
| Closeout Date | 05/11/2015 |
| Work Description | CONSTRUCT PC/PS BULB-TEE GIRDER BRIDGE |
| Location Description | SAN BERNARDINO COUNTY NEAR ESSEX AT VAN WINKLE WASH BRIDGE |
| QA Service Level | 1 (Verified on 12/10/2012) |
Sample Information
| Sample Taken Date | 06/29/2013 | Sample Unique Key | 6180 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/30/2013 | Sample type | Quality Control |
| A brief description of the sample | 6x12 Concrete cylinders | The quantity of what the sample constitutes | 4 concrete cylinders |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jared |
| Last name of sampler or witnessed by | Tietjen | Title of sampler | Field Technician |
| Telephone number of sampler | Not set | Laboratory sample identification | Not set |
| Linked DIME Sample ID | Not set | The fabricator/manufacturer/facility name | Hi-Grade Concrete Supplier |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Abutment no. 1 Pile no. 4 | Structure name | Abutment no. 1 Pile no. 4 |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | HG53401R |
|---|---|---|---|
| The truck number from where the sample was collected | 174 | The batch plant ticket number from where the sample was collected | 810419 |
| Concrete batch plant | Not set | The fabricator/manufacturer designation for the sample | Not set |
| A detailed description of where the material sample was collected | Abutment no. 1 Pile no. 4 - Full Height First Load | Where the material sample would have been placed if not sampled | Abutment no. 1 Pile no. 4 |
| From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2013-06-29-6180
DIME Test ID: 2013-06-29-6180-2
Testing Lab: SCST, LLC
Test Method: CTM 556-June 2010: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2013-07-09
Test Results
Input Type: Calculated
Tester's full name: Jared Tietjen
Date of test: 06/29/2013
Slump: 4.6 in
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/9/2013 ✔