Summary for Test 2020-06-15-26-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214422 DEA: 040J6424 EFIS: 0414000476 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-32.8/R54.2 |
| Award Date | 12/24/2019 |
| Closeout Date | 01/03/2025 |
| Work Description | CRACK, SEAT AND OVERLAY WITH RHMA AND HMA, AND REPLACE CULVERTS. |
| Location Description | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION |
| QA Service Level | 1 (Verified on 09/23/2019) |
Sample Information
| Sample Taken Date | 06/15/2020 | Sample Unique Key | 26 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/24/2020 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder | The quantity of what the sample constitutes | 1 Can, #1 Test |
| From where was the sample collected | Source | First name of sampler or witnessed by | C |
| Last name of sampler or witnessed by | Cordero | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 206065 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Valero - Benicia | |
| Transportation Laboratory (TL) Number | 024525 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-06-15-26
DIME Test ID: 2020-06-15-26-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-09
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 07/09/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 179.430 grams
Mass of container #1 before test (m1i): 214.850 grams
Mass of container #1 after test (m1f): 214.680 grams
Average mass change: -0.480 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/9/2020 ✔
