Summary for Test 2020-06-16-23-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 214732 DEA: 051M5004 EFIS: 0519000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-166-0.2/6.9 |
Award Date | 04/17/2020 |
Closeout Date | 10/29/2020 |
Work Description | COLD PLANE EXISTING ROADWAY AND PLACE RHMA-G. |
Location Description | SANTA BARBARA COUNTY IN AND NEAR GUADALUPE AND SANTA MARIA FROM OBISPO STREET TO BLOSSER ROAD |
QA Service Level | 1 (Verified on 05/29/2020) |
Sample Information
Sample Taken Date | 06/16/2020 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/17/2020 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" HMA-A w/ RAP & LSM |
The quantity of what the sample constitutes | 1 box | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Noah | Last name of sampler or witnessed by | Hunt |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 20-A-099 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CalPortland Garey Hot Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 1 |
Sublot number | 3 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-16-23
DIME Test ID: 2020-06-16-23-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-06-22
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Eric Atkins
Date of test: 06/22/2020
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data g
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data %
Temperature Compensation Factor: no data
Test Temperature: no data F
Corrected Asphalt Binder Content: 7.74 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/22/2020 ✔