Summary for Test 2020-04-30-22-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 213733
DEA: 051C85U4
EFIS: 0518000156
DIST-CO-RTE-PM05-SCR-1-10.2/17.5
Award Date02/19/2019
Closeout Date11/15/2021
Work DescriptionSanta Cruz 1 CAPM and Bridge Rails
Location DescriptionSANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ FROM NORTH APTOS UNDERPASS TO JUNCTION ROUTE 9.
QA Service Level1 (Verified on 02/14/2019)

Sample Information

Sample Taken Date04/30/2020 Sample Unique Key22
Date that the sample was received by the laboratory/organization performing the testing05/27/2020 Sample typeDepartment Acceptance
A brief description of the sampleAsphalt Binder Sample The quantity of what the sample constitutes1 Can
From where was the sample collectedDistributor First name of sampler or witnessed byD Evans
Last name of sampler or witnessed byD Evans Title of sampler
Telephone number of sampler Laboratory sample identificationAB206021
Linked DIME Sample ID The fabricator/manufacturer/facility nameSan Joaquin Refinery
Transportation Laboratory (TL) Number867762 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG64-10
ModifiedNo Lot numberNot set
Sublot numberNot set Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2020-04-30-22
DIME Test ID: 2020-04-30-22-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-06-19

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Baher Fakhoury
Date of test: 06/19/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.393 grams
Mass of container #1 before test (m1i): 207.706 grams
Mass of container #1 after test (m1f): 207.648 grams
Average mass change: -0.164 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/19/2020 ✔