Summary for Test 2020-05-19-33-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 213596 DEA: 051C8904 EFIS: 0513000009 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-101-87.3/R91.5 |
| Award Date | 12/13/2018 |
| Closeout Date | 08/23/2023 |
| Work Description | PRECAST CONC PVMT, CRACK AND SEAT PAVEMENT AND RECONSTRUCT RAMPS. |
| Location Description | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD |
| QA Service Level | 1 (Verified on 01/04/2019) |
Sample Information
| Sample Taken Date | 05/19/2020 | Sample Unique Key | 33 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/27/2020 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1 Can |
| From where was the sample collected | Distributor | First name of sampler or witnessed by | Tyler |
| Last name of sampler or witnessed by | Lavering | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | AB206020 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | San Joaquin Refinery | |
| Transportation Laboratory (TL) Number | 686201 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG64-10 |
|---|---|---|---|
| Modified | No | Lot number | Not set |
| Sublot number | Not set | Tank number | Not set |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-05-19-33
DIME Test ID: 2020-05-19-33-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-06-19
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Baher Fakhoury
Date of test: 06/19/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 166.791 grams
Mass of container #1 before test (m1i): 202.085 grams
Mass of container #1 after test (m1f): 202.017 grams
Average mass change: -0.193 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/19/2020 ✔
