Summary for Test 2020-05-04-29-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 213469
DEA: 024C40V4
EFIS: 0218000125
DIST-CO-RTE-PM02-SHA-5-R3.8/R11.7
Award Date11/06/2018
Closeout Date08/16/2023
Work DescriptionWIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB
Location DescriptionSHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING
QA Service Level1 (Verified on 12/31/2018)

Sample Information

Sample Taken Date05/04/2020 Sample Unique Key29
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/28/2020
Sample typeDepartment Acceptance A brief description of the sampleAsphalt Binder Sample
The quantity of what the sample constitutes1 Can From where was the sample collectedDistributor
First name of sampler or witnessed byJ Gomez Last name of sampler or witnessed byJ Gomez
Title of sampler Telephone number of sampler
Laboratory sample identificationAB206013 Linked DIME Sample ID
The fabricator/manufacturer/facility nameValero - Benicia Transportation Laboratory (TL) Number036432
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG64-16
ModifiedNo Lot numberNot set
Sublot numberNot set Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-04-29
DIME Test ID: 2020-05-04-29-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-06-17

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Baher Fakhoury
Date of test: 06/17/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.623 grams
Mass of container #1 before test (m1i): 207.972 grams
Mass of container #1 after test (m1f): 207.767 grams
Average mass change: -0.58 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/17/2020