Summary for Test 2020-06-03-4-1

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214701
DEA: 030F2844
EFIS: 0319000204
DIST-CO-RTE-PM03-SAC-99-7.1/9.4
Award Date05/14/2020
Closeout Date11/27/2023
Work DescriptionConstruct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments
Location DescriptionNot set
QA Service Level1 (Verified on 04/20/2020)

Sample Information

Sample Taken Date06/03/2020 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing06/05/2020 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)18890-1
Material/Compound/Elastomer IDna Samples Representing47
Description (size)2"x21"x25" CommentsUnknown
Description (Number of Shims)4 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2020-06-03-4
DIME Test ID: 2020-06-03-4-1
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2020-06-09

Test Results


Input Type: Measured
Tester's full name: Rheanna Andelin
Date of test: 06/09/2020
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/9/2020 ✔