Summary for Test 2020-05-26-8-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 214245 DEA: 11404604 EFIS: 1114000049 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-56-5.6 |
| Award Date | 10/21/2019 |
| Closeout Date | 03/01/2022 |
| Work Description | CONSTRUCT 2 LANES, STRUCTURAL CONCRETE BRIDGE. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO AT 0.5 MILE WEST OF CAMINO DEL SUR UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/23/2019) |
Sample Information
| Sample Taken Date | 05/26/2020 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/29/2020 |
| Sample type | Quality Assurance | A brief description of the sample | Lenton Couplers |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Rezn | Last name of sampler or witnessed by | Rafie |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC Rebar Erico Lenton | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
| Coupler Manufacturer | Erico Lention | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | #9 | Coupler Model | EL28A2 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | L9462 | Rebar Heat Number(s) | 9001498 4094536 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-05-26-8
DIME Test ID: 2020-05-26-8-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-05-29
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 05/29/2020
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 9/29mm | 0316 | 0 | 1 | 90326 | 90326 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 5/29/2020 ✔
