Summary for Test 2020-05-20-10-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214515
DEA: 024F6004
EFIS: 0213000012
DIST-CO-RTE-PM02-SIS,TRI-36,96,299-VAR
Award Date01/14/2020
Closeout Date08/24/2022
Work DescriptionBRIDGE DECK REPAIR, POLYESTER OVERLAY AND RAIL REPLACEMENT.
Location DescriptionSISKIYOU AND TRINITY COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 01/22/2020)

Sample Information

Sample Taken Date05/20/2020 Sample Unique Key10
Date that the sample was received by the laboratory/organization performing the testing05/22/2020 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes24
From where was the sample collectedManufacturer First name of sampler or witnessed byKayla
Last name of sampler or witnessed byWallace Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDynamic Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)CR55-008-20
Material/Compound/Elastomer IDNA Samples Representing1
Description (size)5.18 x 20 x 26 CommentsUnknown
Description (Number of Shims)6 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Dynamic Rubber
Batch Number224

Test Details

DIME Sample ID: 2020-05-20-10
DIME Test ID: 2020-05-20-10-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2020-05-28

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 05/28/2020
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/28/2020 ✔