Summary for Test 2020-05-15-4-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 212304 DEA: 021C7504 EFIS: 0200000080 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-14.9 |
| Award Date | 11/30/2017 |
| Closeout Date | 11/24/2021 |
| Work Description | CONCRETE BRIDGE, RETAINING WALLS, HMA, DRAINAGE AND GUARDRAIL. |
| Location Description | PLUMAS COUNTY NEAR BELDEN AT YELLOW CREEK BRIDGE 09-0008 |
| QA Service Level | 1 (Verified on 04/02/2018) |
Sample Information
| Sample Taken Date | 05/15/2020 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/18/2020 |
| Sample type | Quality Assurance | A brief description of the sample | Couplers |
| The quantity of what the sample constitutes | 52 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | G | Last name of sampler or witnessed by | Zimmerman |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Camblin Steel | Transportation Laboratory (TL) Number | C709427 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | #11 | Coupler Model | Griptwist |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | A195823 | Rebar Heat Number(s) | 4080596 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-05-15-4
DIME Test ID: 2020-05-15-4-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-05-19
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 05/18/2020
UTM: 2000kip
Temperature: 72.00 f
Halo ID: Large
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | No. 11/36mm | 1 | -0.0023 | 1.56 | 148123 | 94951 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 5/19/2020 ✔
