Summary for Test 2020-05-14-19-1
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 05/14/2020 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/14/2020 |
| Sample type | Quality Control | A brief description of the sample | RAP ignition 1 |
| The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Paulson |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Materials | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Vulcan Materials |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-05-14-19
DIME Test ID: 2020-05-14-19-1
Testing Lab: Vulcan Materials Company - Pleasanton
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-05-16
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Mike Paulson
Date of test: 05/14/2020
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data g
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data %
Temperature Compensation Factor: no data
Test Temperature: no data F
Corrected Asphalt Binder Content: 6.39 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/16/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
