Summary for Test 2020-02-20-19-5

Test performed: CTM 229-June 2011

Project Information

Project IdentifiersProject ID: 212302
DEA: 080C70U4
EFIS: 0815000189
COOP: 081646
DIST-CO-RTE-PM08-SBD-210-PM R 25
Award Date11/06/2019
Closeout DateNot set
Work DescriptionThe SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps.
Location DescriptionSR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County,
QA Service Level2 (Verified on 01/15/2020)

Sample Information

Sample Taken Date02/20/2020 Sample Unique Key19
Date that the sample was received by the laboratory/organization performing the testing02/18/2020 Sample typeAnnual Source Testing
A brief description of the sampleWashed Concrete Sand The quantity of what the sample constitutes9 bags
From where was the sample collectedSource First name of sampler or witnessed byCHRIS
Last name of sampler or witnessed byHINDMAN Title of samplerQC Technician
Telephone number of sampler Laboratory sample identification9394
Linked DIME Sample ID2020-02-20-19 The fabricator/manufacturer/facility nameROBERTSON REDLANS - QUARRY
Transportation Laboratory (TL) NumberC20-00002 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedunknown
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Sizefine
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-02-20-19
DIME Test ID: 2020-02-20-19-5
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 229-June 2011: Method of Test for Durability Index
Test Release Date: 2020-03-16

Test Results


What test(s) are being run?: Fine durability only
Input Type: Calculated
Tester's full name: HUSNI ANKIR
Date of test: 03/10/2020
Fine durability index: 74
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/16/2020 ✔