Summary for Test 2019-11-06-26-2

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 214664
DEA: 081G7404
EFIS: 0816000060
DIST-CO-RTE-PM08-SBD-15-R110.0
Award Date12/01/2020
Closeout Date06/30/2021
Work DescriptionRECONSTRUCT EARTHEN DIKE, PLACE STRUC. STEEL BRIDGE & TORTOISE FENCE.
Location DescriptionBETWEEN BARSTOW AND BAKER AT 1.6 MILES SOUTH OF AFTON ROAD OVERCROSSING
QA Service Level1 (Verified on 06/23/2021)

Sample Information

Sample Taken Date11/06/2019 Sample Unique Key26
Date that the sample was received by the laboratory/organization performing the testing11/07/2019 Sample typeQuality Assurance
A brief description of the sampleSOIL The quantity of what the sample constitutes2 BAGS
From where was the sample collectedJob Site First name of sampler or witnessed byHAKIMA
Last name of sampler or witnessed byH Title of samplerTE CIVIL
Telephone number of sampler562-665-0454 Laboratory sample identification8818
Linked DIME Sample ID2019-11-06-26 The fabricator/manufacturer/facility nameNATIVE
Transportation Laboratory (TL) NumberC639961 Inspector Lot Number from the Transportation Laboratory (TL) Form S-3
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collected08-SBD-15-PM110 SURFACE
Where the material sample would have been placed if not sampledUnknown

Test Details

DIME Sample ID: 2019-11-06-26
DIME Test ID: 2019-11-06-26-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2020-03-12

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: KIET PHAN
Date of test: 11/19/2019
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 99 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 96 %
Cumulative percent passing the #4 sieve: 95 %
Cumulative percent passing the #8 sieve: 94 %
Cumulative percent passing the #16 sieve: 89 %
Cumulative percent passing the #30 sieve: 72 %
Cumulative percent passing the #50 sieve: 40 %
Cumulative percent passing the #100 sieve: 16 %
Cumulative percent passing the #200 sieve: 7.6 %
Cumulative Percent Passing on 5 Microns: 4 %
Cumulative Percent Passing on 1 Micron: 3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/12/2020 ✔