Summary for Test 2019-07-30-16-2
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 213469 DEA: 024C40V4 EFIS: 0218000125 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-5-R3.8/R11.7 |
| Award Date | 11/06/2018 |
| Closeout Date | 08/16/2023 |
| Work Description | WIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB |
| Location Description | SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 12/31/2018) |
Sample Information
| Sample Taken Date | 07/30/2019 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/30/2019 |
| Sample type | Verification | A brief description of the sample | Combined RAP, 3/8-inch |
| The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Colt | Last name of sampler or witnessed by | Sweeny |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D78055 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Fawndale Rock Quarry | Transportation Laboratory (TL) Number | 736161 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Fawndale Rock and Asphalt, Redding, CA |
|---|---|---|---|
| Aggregate Size | Combined, 3/8-inch | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-07-30-16
DIME Test ID: 2019-07-30-16-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-03-09
Test Results
Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 08/01/2019
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 97.4 % | ||||||
| 79.1 % | ||||||
| 67 % | ||||||
| 47.1 % | ||||||
| 34.5 % | ||||||
| 26 % | ||||||
| 19.6 % | ||||||
| 14.2 % | ||||||
| 10.4 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/9/2020 ✔
