Summary for Test 2020-01-23-23-2
Test performed: CTM 523-July 2012Project Information
| Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
| Award Date | 04/17/2017 |
| Closeout Date | 08/01/2024 |
| Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
| Location Description | Riverside County and SBD-15-0.0/1.3 |
| QA Service Level | 1 (Verified on 05/08/2017) |
Sample Information
| Sample Taken Date | 01/23/2020 | Sample Unique Key | 23 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/24/2020 | Sample type | Quality Assurance |
| A brief description of the sample | concrete beams | The quantity of what the sample constitutes | 4 Beams |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | QA |
| Last name of sampler or witnessed by | QA | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 40A1, 40A2, 40B1, 40B2 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | security paving Corona | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 33-paving | Structure name | Unknown |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-18-PCC-135 |
|---|---|---|---|
| The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | tt1 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2020-01-23-23
DIME Test ID: 2020-01-23-23-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 523-July 2012: Method of Test for Flexural Strength of Concrete
Test Release Date: 2020-02-26
Test Results
What test method is being used?: Third-Point Loading
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Lab procedure used: Method B
Input Type: Calculated
Tester's full name: E. Hamel / M. Warde
Date of test: 02/04/2020
Identification number: 40A2
Width of specimen: 6 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 5990 lb
Curing history and apparent moisture condition of the specimen: Sand pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen: No
Age of specimen: 12 days
Modulus of rupture: 510 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/26/2020 ✔