Summary for Test 2014-08-20-25-3

Test performed: CTM 211-May 2010

Project Information

Project IdentifiersProject ID: 209242
DEA: 080P3104
EFIS: 0800001017
DIST-CO-RTE-PM08-SBD-395-16.2
Award Date02/20/2014
Closeout Date06/19/2015
Work DescriptionINSTALL TRAFFIC SIGNAL, INTERCONNECT, RAMP METER, AND LIGHTING
Location DescriptionSAN BERNARDINO COUNTY, IN ADELANTO, AT THE INTERSECTION OF STATE ROUTE 395 AND BARTLETT ROAD
QA Service Level1 (Verified on 04/16/2014)

Sample Information

Sample Taken Date08/20/2014 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing08/20/2014 Sample typeAnnual Source Testing
A brief description of the sampleOne and a half inch PCC Aggregates The quantity of what the sample constitutes8 Bags
From where was the sample collectedSource First name of sampler or witnessed byTom
Last name of sampler or witnessed byMilum Title of samplerQC Technician
Telephone number of samplerUnknown Laboratory sample identification4236B
Linked DIME Sample ID0 The fabricator/manufacturer/facility nameRoberts Lucern Valley
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)SMARA 91 36 0116
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpiles
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2014-08-20-25
DIME Test ID: 2014-08-20-25-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2015-02-20

Test Results


How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Nader Rashidi
Date of test: 08/26/2014
Grading: A
Percent wear: 36 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/20/2015 ✔