Summary for Test 2019-12-20-17-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 209139
DEA: 071170U4
EFIS: 0700000085
DIST-CO-RTE-PM07-LA-10-33.2/37.2
Award Date02/10/2014
Closeout Date03/01/2022
Work DescriptionCONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING
QA Service Level1 (Verified on 05/06/2014)

Sample Information

Sample Taken Date12/20/2019 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/27/2019
Sample typeDepartment Acceptance A brief description of the sampleWashed Concrete Sand
The quantity of what the sample constitutes1 bags From where was the sample collectedManufacturer
First name of sampler or witnessed byGERADO Last name of sampler or witnessed byZubieta
Title of samplerTE CIVIL Telephone number of sampler
Laboratory sample identification9070 Linked DIME Sample ID2019-12-19-17
The fabricator/manufacturer/facility nameROBERTSON IRWINDALE Transportation Laboratory (TL) NumberC923412
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedunknown
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Sizefine
The concrete mix design number16015 Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-12-20-17
DIME Test ID: 2019-12-20-17-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-03-17

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: LARRY DIAZ
Date of test: 01/03/2020
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 96 %
Cumulative percent passing the #8 sieve: 82 %
Cumulative percent passing the #16 sieve: 68 %
Cumulative percent passing the #30 sieve: 48 %
Cumulative percent passing the #50 sieve: 22 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 2.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/17/2020