Summary for Test 2020-01-29-8-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 213764 DEA: 080F0304 EFIS: 0800020358 |
---|---|
DIST-CO-RTE-PM | 08-SBD-60-R0.7/R3.0 |
Award Date | 03/07/2019 |
Closeout Date | 07/27/2023 |
Work Description | REMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60 |
Location Description | IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 05/01/2019) |
Sample Information
Sample Taken Date | 01/29/2020 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/31/2020 |
Sample type | Quality Assurance | A brief description of the sample | #4 Rebar Coupled bars |
The quantity of what the sample constitutes | 4 coupled bars | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Rigoberto | Last name of sampler or witnessed by | Marin |
Title of sampler | Inspector | Telephone number of sampler | 951-500-0685 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Integrity Rebar Placers | Transportation Laboratory (TL) Number | L133-012-20 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gardau AmeriSteel |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
Rebar Size | 4 | Coupler Model | 4DBZA |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 9085 | Rebar Heat Number(s) | 65029691 |
Rebar Size 2 | 4 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-01-29-8
DIME Test ID: 2020-01-29-8-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-02-03
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 01/31/2020
UTM: 400KIP
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | 4/13mm | 0.2 | 18659.26 | 93296 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 2/3/2020 ✔