Summary for Test 2019-12-12-22-3
Test performed: CTM 523-July 2012Project Information
| Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
| Award Date | 04/17/2017 |
| Closeout Date | Not set |
| Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
| Location Description | Riverside County and SBD-15-0.0/1.3 |
| QA Service Level | 1 (Verified on 05/08/2017) |
Sample Information
| Sample Taken Date | 12/12/2019 | Sample Unique Key | 22 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/13/2019 |
| Sample type | Quality Assurance | A brief description of the sample | concrete beams |
| The quantity of what the sample constitutes | 6 Beams | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ahmad | Last name of sampler or witnessed by | ALZUBI |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 37A1,37A2,37B1, 37B2 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | security paving Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 33-paving | |
| Structure name | Unknown | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-18-PCC-135 |
|---|---|---|---|
| The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | tt1 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-12-12-22
DIME Test ID: 2019-12-12-22-3
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 523-July 2012: Method of Test for Flexural Strength of Concrete
Test Release Date: 2020-01-09
Test Results
What test method is being used?: Third-Point Loading
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Lab procedure used: Method B
Input Type: Calculated
Tester's full name: E. Hamel, A. Nguyen
Date of test: 01/09/2020
Identification number: 37B1
Width of specimen: 6 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 7265 lb
Curing history and apparent moisture condition of the specimen: Sand pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen: None
Age of specimen: 28 days
Modulus of rupture: 620 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/9/2020 ✔
