Summary for Test 2019-12-11-44-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
| Award Date | 05/27/2016 |
| Closeout Date | 08/01/2023 |
| Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
| Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
| QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
| Sample Taken Date | 12/11/2019 | Sample Unique Key | 44 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/11/2019 |
| Sample type | Department Acceptance | A brief description of the sample | 1" AGGREGATE |
| The quantity of what the sample constitutes | 2 BAGS | From where was the sample collected | Distributor |
| First name of sampler or witnessed by | Zaid | Last name of sampler or witnessed by | Abdelkhaliq |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 8971 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | SECURITY PLANT LA-MIRADA | Transportation Laboratory (TL) Number | C914389 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 1 inch aggregate | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | Belt Cut at Plant |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 1 inch |
| The concrete mix design number | G3-19-PCC-001 | Lot number | Unknown |
| Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-12-11-44
DIME Test ID: 2019-12-11-44-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-03-17
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: LARY DIAZ
Date of test: 12/14/2019
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 79 % | ||||||
| 21 % | ||||||
| 9 % | ||||||
| 6 % | ||||||
| 4.8 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/17/2020 ✔
