Summary for Test 2019-09-09-18-2
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 214236 DEA: 024H3804 EFIS: 0218000112 MINOR: 02A1831 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-36-6.6/6.6001 |
| Award Date | Not set |
| Closeout Date | 12/23/2020 |
| Work Description | Chester MS Infiltration Trench Project |
| Location Description | Storm Water Improvements in Plumas County about 1.9 miles West of Chester at the Chester Maintenance Station. |
| QA Service Level | 1 (Verified on 01/22/2020) |
Sample Information
| Sample Taken Date | 09/09/2019 | Sample Unique Key | 18 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/10/2019 | Sample type | Verification |
| A brief description of the sample | Combined 1/2-inch RAP | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Robert |
| Last name of sampler or witnessed by | Nixa | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | D78165B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Sierra Cascade Aggregate and Asphalt Products | |
| Transportation Laboratory (TL) Number | 847546 | Inspector Lot Number from the Transportation Laboratory (TL) Form | JMF |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Sierra Cascade |
|---|---|---|---|
| Aggregate Size | Combined | Aggregate Source | Unknown |
| RAP Stockpile | Static | Stockpile Size (tons) | Unknown |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-09-09-18
DIME Test ID: 2019-09-09-18-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-18
Test Results
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 09/11/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 98.8 %
Cumulative percent passing the 3/8 in. sieve: 93.8 %
Cumulative percent passing the 1/4 in. sieve: 82.3 %
Cumulative percent passing the #4 sieve: 73.4 %
Cumulative percent passing the #8 sieve: 54.1 %
Cumulative percent passing the #16 sieve: 40 %
Cumulative percent passing the #30 sieve: 29.9 %
Cumulative percent passing the #50 sieve: 21.6 %
Cumulative percent passing the #100 sieve: 15.2 %
Cumulative percent passing the #200 sieve: 11.07 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/18/2019 ✔
