Summary for Test 2019-09-09-18-2

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 214236
DEA: 024H3804
EFIS: 0218000112
MINOR: 02A1831
DIST-CO-RTE-PM02-PLU-36-6.6/6.6001
Award DateNot set
Closeout Date12/23/2020
Work DescriptionChester MS Infiltration Trench Project
Location DescriptionStorm Water Improvements in Plumas County about 1.9 miles West of Chester at the Chester Maintenance Station.
QA Service Level1 (Verified on 01/22/2020)

Sample Information

Sample Taken Date09/09/2019 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing09/10/2019 Sample typeVerification
A brief description of the sampleCombined 1/2-inch RAP The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed byRobert
Last name of sampler or witnessed byNixa Title of sampler
Telephone number of sampler Laboratory sample identificationD78165B
Linked DIME Sample ID The fabricator/manufacturer/facility nameSierra Cascade Aggregate and Asphalt Products
Transportation Laboratory (TL) Number847546 Inspector Lot Number from the Transportation Laboratory (TL) FormJMF
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceSierra Cascade
Aggregate SizeCombined Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-09-09-18
DIME Test ID: 2019-09-09-18-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-18

Test Results


Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 09/11/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 98.8 %
Cumulative percent passing the 3/8 in. sieve: 93.8 %
Cumulative percent passing the 1/4 in. sieve: 82.3 %
Cumulative percent passing the #4 sieve: 73.4 %
Cumulative percent passing the #8 sieve: 54.1 %
Cumulative percent passing the #16 sieve: 40 %
Cumulative percent passing the #30 sieve: 29.9 %
Cumulative percent passing the #50 sieve: 21.6 %
Cumulative percent passing the #100 sieve: 15.2 %
Cumulative percent passing the #200 sieve: 11.07 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/18/2019 ✔