Summary for Test 2019-11-19-13-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date11/19/2019 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing11/22/2019 Sample typeVerification
A brief description of the sampleRAP The quantity of what the sample constitutesJMF Prequalification
From where was the sample collectedManufacturer First name of sampler or witnessed byNick
Last name of sampler or witnessed byHall Title of sampler
Telephone number of sampler Laboratory sample identification19-277
Linked DIME Sample ID The fabricator/manufacturer/facility nameSYAR Lake Herman Drum
Transportation Laboratory (TL) NumberC911407 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceLake Herman Quarry
Aggregate Size0.375 in Minus Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)2500
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-11-19-13
DIME Test ID: 2019-11-19-13-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-11

Test Results


Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 12/11/2019
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.8 %
Cumulative percent passing the 1/4 in. sieve: 79.6 %
Cumulative percent passing the #4 sieve: 79.6 %
Cumulative percent passing the #8 sieve: 56.8 %
Cumulative percent passing the #16 sieve: 40.8 %
Cumulative percent passing the #30 sieve: 30.7 %
Cumulative percent passing the #50 sieve: 21.8 %
Cumulative percent passing the #100 sieve: 14.3 %
Cumulative percent passing the #200 sieve: 10.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/11/2019