Summary for Test 2019-10-25-22-4
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/25/2019 | Sample Unique Key | 22 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/01/2019 |
| Sample type | Verification | A brief description of the sample | RAP |
| The quantity of what the sample constitutes | JMF Prequalification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Cody | Last name of sampler or witnessed by | Brown |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 19-263 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Syar Indunsties Lake Herman Batch | Transportation Laboratory (TL) Number | 911405 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Lake Herman Quarry |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Static | Stockpile Size (tons) | 3200 |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-10-25-22
DIME Test ID: 2019-10-25-22-4
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-04
Test Results
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 12/04/2019
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.9 %
Cumulative percent passing the 1/4 in. sieve: 83.2 %
Cumulative percent passing the #4 sieve: 83.2 %
Cumulative percent passing the #8 sieve: 61.2 %
Cumulative percent passing the #16 sieve: 44.4 %
Cumulative percent passing the #30 sieve: 33.6 %
Cumulative percent passing the #50 sieve: 23.9 %
Cumulative percent passing the #100 sieve: 15.9 %
Cumulative percent passing the #200 sieve: 11 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/4/2019 ✔
