Summary for Test 2019-11-15-35-2
Test performed: ASTM A970-15e1Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Sample Information
Sample Taken Date | 11/15/2019 | Sample Unique Key | 35 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/20/2019 |
Sample type | Quality Assurance | A brief description of the sample | Headed Rebar |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Reyes | Last name of sampler or witnessed by | Danny |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Rebar Erico Lenton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | B30102719 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Headed Bars | Production or Authorization Testing | Production Testing |
---|---|---|---|
Rebar Heat Number(s) | 4088266 | Head Manufacturer Lot Number(s) | U0027 |
Rebar Size | 6 | Headed Bar Model Name | Erico |
Size of Head | Reduced Size - 4x | Head Connection Type | Friction Weld |
Head Shape | Circular | Rebar Manufacturer | CMC Rebar |
Head Manufacturer | Erico | Head Fabricator | Erico |
Material Standard Code | ASTM A706 | Headed Bar Unique ID | Not set |
Test Details
DIME Sample ID: 2019-11-15-35
DIME Test ID: 2019-11-15-35-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A970-15e1: Standard Specification for Headed Steel Bars for Concrete Reinforcement (Tensile)
Test Release Date: 2019-11-26
Test Results
Number of Headed Bar Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 11/22/2019
UTM: 400kip
Temperature: 72 f
Num | Lot # | Area (sqin) | Peak Load (lbf) | Tensile Strength (psi) | Comments | Tested By |
---|---|---|---|---|---|---|
1 | 1 | 0.44 | 42428 | 96428 | Ok Necking | bewing |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 11/26/2019 ✔