Summary for Test 2014-09-17-5-1
Test performed: ASTM C136-06Project Information
Project Identifiers | Project ID: 209175 DEA: 030F2204 EFIS: 0300000072 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-R30.7/R31.7 |
Award Date | 02/25/2014 |
Closeout Date | 07/30/2015 |
Work Description | REPLACE BRIDGE. |
Location Description | SLY PARK UNDERCROSSING |
QA Service Level | 1 (Verified on 11/01/2013) |
Sample Information
Sample Taken Date | 09/17/2014 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/17/2014 |
Sample type | Quality Control | A brief description of the sample | Stage 2 Abutment 1 |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Andrew | Last name of sampler or witnessed by | Martin |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | 0 |
The fabricator/manufacturer/facility name | Folsom Ready Mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Stage 2 Abutment 1 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Folsom Ready Mix Stockpile |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | |
The concrete mix design number | Lot number | Not set | |
Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2014-09-17-5
DIME Test ID: 2014-09-17-5-1
Testing Lab: Viking Construction Company, Incorporated - Rancho Cordova
Test Method: ASTM C136-06: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2014-09-22
Test Results
What type of gradation is being tested?: 1 in. x No. 4 - Coarse Aggregate
Input Type: Calculated
Tester's full name: Marc Martin
Date of test: 09/17/2014
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 98 %
Cumulative percent passing the 3/4 in. sieve: 77 %
Cumulative percent passing the 1/2 in. sieve: 33 %
Cumulative percent passing the 3/8 in. sieve: 12 %
Cumulative percent passing the #4 sieve: 2 %
Cumulative percent passing the #8 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/22/2014 ✔