Summary for Test 2014-08-14-23-3
Test performed: CTM 229-June 2011Project Information
| Project Identifiers | Project ID: 7427 DEA: 07215934 EFIS: 0700001833 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-2.4/4.0 |
| Award Date | 08/14/2012 |
| Closeout Date | 02/20/2020 |
| Work Description | Widen and Realign Freeway and Construct Ped OC, OC and UC Structures. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM 0.1 MILE NORTH OF CARMENITA ROAD OVERCROSSING TO 0.1 MILE NORTH OF SILVERBOW AVENUE PEDESTRIAN OVERCROSSING |
| QA Service Level | 1 (Verified on 11/26/2012) |
Sample Information
| Sample Taken Date | 08/14/2014 | Sample Unique Key | 23 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/14/2014 |
| Sample type | Department Acceptance | A brief description of the sample | Class 3 Aggregate Base |
| The quantity of what the sample constitutes | 2 Bags | From where was the sample collected | Other |
| First name of sampler or witnessed by | Syed | Last name of sampler or witnessed by | Shah |
| Title of sampler | ARE | Telephone number of sampler | Unknown |
| Laboratory sample identification | 4233B | Linked DIME Sample ID | 0 |
| The fabricator/manufacturer/facility name | I 5 Mainline at Sta 168 50 | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | I 5 Mainline at Sta 168 50 |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | |
| The concrete mix design number | Lot number | Not set | |
| Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2014-08-14-23
DIME Test ID: 2014-08-14-23-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 229-June 2011: Method of Test for Durability Index
Test Release Date: 2015-02-20
Test Results
What test(s) are being run?: Coarse durability and fine durability
Input Type: Calculated
Tester's full name: Nader Rashidi
Date of test: 08/18/2014
Coarse durability index: 80
Fine durability index: 67
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/20/2015 ✔
