Summary for Test 2019-10-24-5-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 212914 DEA: 031E0604 EFIS: 0312000068 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-70-15.5/16.5 |
| Award Date | 07/31/2019 |
| Closeout Date | 08/30/2023 |
| Work Description | SIMMERLY SLOUGH BRIDGE REPLACEMENT BR 16-0019 WITH BR 16-0055. |
| Location Description | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE BR 16-0019. |
| QA Service Level | 1 (Verified on 08/22/2019) |
Sample Information
| Sample Taken Date | 10/24/2019 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/29/2019 |
| Sample type | Quality Assurance | A brief description of the sample | size10 HRC 500-510 coupler |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jason | Last name of sampler or witnessed by | C |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC HRC | Transportation Laboratory (TL) Number | C |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | 7 | Coupler Model | HRC 500-510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | A182735 351817 | Rebar Heat Number(s) | 4084823 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-10-24-5
DIME Test ID: 2019-10-24-5-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2019-10-29
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 10/29/2019
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 7/22mm | 1 | 0 | 0.6 | 56747 | 94578 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 10/29/2019 ✔
