Summary for Test 2019-10-10-8-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 213469 DEA: 024C40V4 EFIS: 0218000125 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-5-R3.8/R11.7 |
| Award Date | 11/06/2018 |
| Closeout Date | 08/16/2023 |
| Work Description | WIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB |
| Location Description | SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 12/31/2018) |
Sample Information
| Sample Taken Date | 10/10/2019 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/10/2019 |
| Sample type | Quality Assurance | A brief description of the sample | Coupler |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Luecering |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC | Transportation Laboratory (TL) Number | C815915 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | Dayton Superior | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | 8 | Coupler Model | Barlock |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | A180948 | Rebar Heat Number(s) | 4087672 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-10-10-8
DIME Test ID: 2019-10-10-8-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2019-10-14
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 10/11/2019
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | No. 8/25mm | 1 | 0 | 0.79 | 71764 | 90841 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 10/14/2019 ✔
