Summary for Test 2019-10-01-26-1
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/01/2019 | Sample Unique Key | 26 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Quality Control |
| A brief description of the sample | 3/4 inch HMA-SP RAP WMA | The quantity of what the sample constitutes | 1 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Marina |
| Last name of sampler or witnessed by | Kamel | Title of sampler | |
| Telephone number of sampler | 707-259-5708 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | SYAR Lake Herman Drum | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Stockpile@Plant |
|---|---|---|---|
| Aggregate Size | 3/4 inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-10-01-26
DIME Test ID: 2019-10-01-26-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-10-11
Test Results
Input Type: Calculated
Tester's full name: Lake Herman Lab
Date of test: 10/01/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 85.5 %
Cumulative percent passing the #8 sieve: 65.2 %
Cumulative percent passing the #16 sieve: 46.6 %
Cumulative percent passing the #30 sieve: 33.9 %
Cumulative percent passing the #50 sieve: 23.1 %
Cumulative percent passing the #100 sieve: 13.3 %
Cumulative percent passing the #200 sieve: 8.4 %
General comments (publicly viewable) (Max 1000 characters): RAP Sample 1 T-30
Test was verified on 10/11/2019 ✔
