Summary for Test 2019-03-08-21-2
Test performed: CTM 211-May 2010Project Information
Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 03/08/2019 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
Sample type | Aggregate Prequalification Program | A brief description of the sample | Washed 1 1/2 Crushed Rock |
The quantity of what the sample constitutes | 160 lbs | From where was the sample collected | Source |
First name of sampler or witnessed by | Tyler | Last name of sampler or witnessed by | Lavorci |
Title of sampler | QC Technician | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Azusa Fish Canyon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0035::FISH CANYON QUARRY |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Washed 1 1/2 Crushed Rock | The fabricator/manufacturer designation for the sample | |
The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1-1/2 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-03-08-21
DIME Test ID: 2019-03-08-21-2
Testing Lab: Vulcan Materials Company - Irwindale
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2019-10-01
Test Results
How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Dale Bartlett
Date of test: 06/18/2019
Grading: A
Percent wear: 18 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/1/2019 ✔