Summary for Test 2019-09-24-8-2
Test performed: ASTM A775-07b-re14Project Information
| Project Identifiers | Project ID: 213357 DEA: 024F2004 EFIS: 0212000071 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-44-59.4/59.8 |
| Award Date | 11/02/2018 |
| Closeout Date | 01/04/2021 |
| Work Description | BRIDGE REPLACEMENT |
| Location Description | SHASTA COUNTY NEAR OLD STATION FROM 0.3 MILE WEST TO 0.2 MILE EAST OF HAT CREEK BRIDGE |
| QA Service Level | 1 (Verified on 06/21/2018) |
Sample Information
| Sample Taken Date | 09/24/2019 | Sample Unique Key | 8 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/24/2019 | Sample type | Quality Assurance |
| A brief description of the sample | #5 Epoxy coated Rebar | The quantity of what the sample constitutes | 3 |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Paul |
| Last name of sampler or witnessed by | Farinha | Title of sampler | Associate Steel Inspector |
| Telephone number of sampler | 9167987102 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Farwest | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | S51-32-19 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM7 - Epoxy Coated Rebar | Rebar Heat Number(s) | 310819 |
|---|---|---|---|
| Rebar Epoxy Batch Number(s) | 3CH1923108 | Rebar Coating Specification | ASTM A775 |
| Rebar Size (#) | 5 | Rebar Coating Color | Green |
| Rebar Manufacturer | Cascade Steel | Rebar Coater | Farwest |
| Rebar Powder Manufacturer | Sherwin Williams | Release Number | Unknown |
| Quality Assurance Code | Unknown |
Test Details
DIME Sample ID: 2019-09-24-8
DIME Test ID: 2019-09-24-8-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A775-07b-re14: Standard Specification for Epoxy-Coated Steel Reinforcing Bars (Holiday)
Test Release Date: 2019-09-26
Test Results
Input Type: Measured
Tester's full name: Fred Saylor
Date of test: 09/26/2019
Total Number of Holiday: 0
Total Length: 5
Holidays Per Linear Foot of Bar: 0
Holiday Test Pass/Fail: Pass
Bend Test Pass/Fail: Pass
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/26/2019 ✔
