Summary for Test 2019-09-14-2-10
Test performed: CTM 301-March 2000Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Sample Information
Sample Taken Date | 09/14/2019 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/16/2019 |
Sample type | Per Request | A brief description of the sample | Class 2 Aggregate Base |
The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Ahmad | Last name of sampler or witnessed by | Alzubi |
Title of sampler | TE | Telephone number of sampler | (909) 829-3350 |
Laboratory sample identification | 8714 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Caltrans | Transportation Laboratory (TL) Number | C013125 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Stockpile at Batch Plant Rte 60 PM 8.00 |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Unknown | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-09-14-2
DIME Test ID: 2019-09-14-2-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2019-09-20
Test Results
How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Tess perez / Kiet Phan
Date of test: 09/19/2019
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 96 %
As Received Gradation, Percent Passing 1/2 in. sieve: 80 %
As Received Gradation, Percent Passing 3/8 in. sieve: 69 %
As Received Gradation, Percent Passing #4 sieve: 49 %
As Received Gradation, Percent Passing #8 sieve: 36 %
As Received Gradation, Percent Passing #16 sieve: 25 %
As Received Gradation, Percent Passing #30 sieve: 17 %
As Received Gradation, Percent Passing #50 sieve: 11 %
As Received Gradation, Percent Passing #100 sieve: 7 %
As Received Gradation, Percent Passing #200 sieve: 4.9 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 96 %
As Used Gradation, Percent Passing 1/2 in. sieve: 80 %
As Used Gradation, Percent Passing 3/8 in. sieve: 69 %
As Used Gradation, Percent Passing #4 sieve: 49 %
As Used Gradation, Percent Passing #8 sieve: 36 %
As Used Gradation, Percent Passing #16 sieve: 25 %
As Used Gradation, Percent Passing #30 sieve: 17 %
As Used Gradation, Percent Passing #50 sieve: 11 %
As Used Gradation, Percent Passing #100 sieve: 7 %
As Used Gradation, Percent Passing #200 sieve: 4.9 %
R value: 81
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/20/2019 ✔