Summary for Test 2019-06-27-26-6

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214339
DEA: 081G0004
EFIS: 0815000107
DIST-CO-RTE-PM08-RIV-95-14.5/35.6
Award Date11/04/2020
Closeout Date03/01/2022
Work DescriptionCONSTRUCT CONCRETE/RSP APRONS
Location DescriptionRIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 4 MILES NORTH OF PALO VERDE DAM ROAD TO 0.6 MILE SOUTH OF SAN BERNARDINO COUNTY LINE
QA Service Level1 (Verified on 12/02/2020)

Sample Information

Sample Taken Date06/27/2019 Sample Unique Key26
Date that the sample was received by the laboratory/organization performing the testing06/28/2019 Sample typePreliminary
A brief description of the sampleSoil obtained from depth of 5' The quantity of what the sample constitutes1 bag
From where was the sample collectedJob Site First name of sampler or witnessed byJose
Last name of sampler or witnessed byGuzman Title of samplerMREA
Telephone number of sampler Laboratory sample identification8631
Linked DIME Sample ID The fabricator/manufacturer/facility nameCaltrans
Transportation Laboratory (TL) Number8631 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedRte 95, PM 24.79, Outside shoulder
Where the material sample would have been placed if not sampledUnknown

Test Details

DIME Sample ID: 2019-06-27-26
DIME Test ID: 2019-06-27-26-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-09-12

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Larry Diaz
Date of test: 07/07/2019
Sieve SizeCumulative Percent Passing
82 %
72 %
65 %
56 %
48 %
31 %
13 %
4.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/12/2019 ✔