Summary for Test 2014-07-28-9006105-3

Test performed: CTM 211-May 2010

Project Information

Project IdentifiersProject ID: 209139
DEA: 071170U4
EFIS: 0700000085
DIST-CO-RTE-PM07-LA-10-33.2/37.2
Award Date02/10/2014
Closeout Date03/01/2022
Work DescriptionCONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING
QA Service Level1 (Verified on 05/06/2014)

Sample Information

Sample Taken Date07/28/2014 Sample Unique Key9006105
Date that the sample was received by the laboratory/organization performing the testing07/28/2014 Sample typeAnnual Source Testing
A brief description of the sampleOne and a half inch rock The quantity of what the sample constitutes8 Bags
From where was the sample collectedSource First name of sampler or witnessed byUnknown
Last name of sampler or witnessed byUnknown Title of sampler
Telephone number of sampler Laboratory sample identification4199B
Linked DIME Sample IDNot set The fabricator/manufacturer/facility nameRobertsons Redlands
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-36-0072::REDLANDS WASH PLAN (ROBERTSON'S READY MIX)
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedPlant Stockpiles
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2014-07-28-9006105
DIME Test ID: 2014-07-28-9006105-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2015-02-20

Test Results


How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Farzin Farah
Date of test: 07/31/2014
Grading: A
Percent wear: 40 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/20/2015 ✔