Summary for Test 2019-05-09-17-4
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
| Award Date | 04/24/2014 |
| Closeout Date | 07/14/2022 |
| Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
| Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
| QA Service Level | 1 (Verified on 06/02/2014) |
Sample Information
| Sample Taken Date | 05/09/2019 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/10/2019 |
| Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Kristin | Last name of sampler or witnessed by | Frisch |
| Title of sampler | Field Technician | Telephone number of sampler | Unknown |
| Laboratory sample identification | Set 1 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Jobsite | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Unknown | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S62578 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | NB RTE 5, STA 348-40 to 349-70 | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-05-09-17
DIME Test ID: 2019-05-09-17-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2019-08-08
Test Results
Input Type: Calculated
Tester's full name: Kristin Frisch
Date of test: 05/09/2019
Unit weight of the concrete: 150.6 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/8/2019 ✔
