Summary for Test 2019-07-26-9-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212956
DEA: 080R3404
EFIS: 0812000072
DIST-CO-RTE-PM08-SBD-38-30.9
Award Date03/06/2018
Closeout Date09/30/2019
Work DescriptionBRIDGE REHABILITATION AND UPGRADE BRIDGE RAILING TO STANDARDS
Location DescriptionSAN BERNARDINO COUNTY NEAR ANGELUS OAKS AT SANTA ANA RIVER BRIDGERAM
QA Service Level1 (Verified on 05/09/2018)

Sample Information

Sample Taken Date07/26/2019 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing07/31/2019 Sample typeDepartment Acceptance
A brief description of the sample1/2 HMA-A-SP R15 The quantity of what the sample constitutes1 box
From where was the sample collectedManufacturer First name of sampler or witnessed byAll American Asphalt Corona
Last name of sampler or witnessed byQC Title of sampler
Telephone number of sampler Laboratory sample identification0451A-19
Linked DIME Sample ID The fabricator/manufacturer/facility nameAll American Asphalt Corona
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot numberUnknown
Sublot numberUnknown HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2019-07-26-9
DIME Test ID: 2019-07-26-9-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-08-02

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Angelito villegas
Date of test: 08/01/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.86 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/2/2019 ✔