Summary for Test 2019-04-17-49-3
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 04/17/2019 | Sample Unique Key | 49 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/17/2019 | Sample type | Aggregate Prequalification Program |
| A brief description of the sample | Fine Aggregate | The quantity of what the sample constitutes | 60 lbs |
| From where was the sample collected | Source | First name of sampler or witnessed by | Paul |
| Last name of sampler or witnessed by | Reno | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Holliday Rock Mojave | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-15-0080::MOJAVE QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | WCS | The fabricator/manufacturer designation for the sample | |
| The plant number | A detailed description of where the material sample was collected | from a stock production pile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-17-49
DIME Test ID: 2019-04-17-49-3
Testing Lab: Holliday Rock Company, Incorporated
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2019-07-24
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Travis Diaz
Date of test: 06/20/2019
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 4.8
Sand reading (test 1): 3.8
Sand equivalent (test 1): 80
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/24/2019 ✔