Summary for Test 2014-07-31-10101214-3
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 208679 DEA: 100S1104 EFIS: 1000000229 COOP: 10406 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4,5-Var |
Award Date | 12/16/2013 |
Closeout Date | 01/03/2019 |
Work Description | SR-4 FREEWAY EXTENSION |
Location Description | IN SAN JOAQUIN COUNTY |
QA Service Level | 1 (Verified on 03/25/2013) |
Sample Information
Sample Taken Date | 07/31/2014 | Sample Unique Key | 10101214 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/28/2014 |
Sample type | Annual Source Testing | A brief description of the sample | Sand |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Cummings |
Title of sampler | Not set | Telephone number of sampler | Not set |
Laboratory sample identification | 14FPCC-0264 C638416A | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | Confab Lathrop - KRC Vernalis | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | S29-074-14 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Not set | The fabricator/manufacturer designation for the sample | Not set |
The plant number | Not set | A detailed description of where the material sample was collected | Stockpile |
Where the material sample would have been placed if not sampled | Not set | Primary Aggregate Nominal Size | |
The concrete mix design number | Lot number | Not set | |
Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2014-07-31-10101214
DIME Test ID: 2014-07-31-10101214-3
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2014-07-31
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Thomas Stinnett
Date of test: 07/31/2014
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 89 %
Cumulative percent passing the #16 sieve: 62 %
Cumulative percent passing the #30 sieve: 41 %
Cumulative percent passing the #50 sieve: 22 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/31/2014 ✔